Authorized dealer · Certified installers · Charlotte, NC headquarters
360 Technology Group is an authorized ZKTeco dealer and certified installer
We have been selling, installing, programming and servicing ZKTeco systems across North and South Carolina since 2018 — more than 8 years. Our scope covers ZKTeco Atlas and AtlasCloud access control, Cielo365, biometric readers and entrance control.
- Authorized ZKTeco dealer — we quote and supply genuine ZKTeco equipment, licensing and subscriptions.
- Certified ZKTeco installers — our technicians install, wire, program, commission and document the system.
- Repair and takeover — we service, troubleshoot, expand and take over existing ZKTeco installations we did not originally install.
- 24/7 emergency service — on-call service technicians for emergency repairs, plus scheduled preventive maintenance.
We cover every city in North Carolina and South Carolina from our Charlotte headquarters. Request a quote or service call Call 704-726-4254
North Carolina and South Carolina planning guide
ZKTECO
Selecting ZKTECO is an architecture decision as much as a purchasing decision. A complete scope explains what is being solved, what must integrate, how failure is handled and who owns the system after handoff.

Start with the decision, not the catalog
360 Technology Group evaluates ZKTECO as part of a complete access-control and electronic-door system. The recommendation should follow a field-verified problem statement, not a presumption that every published feature belongs in the project.
Discovery documents the current equipment, affected users, desired workflows, required integrations, security and privacy expectations, project constraints and measurable acceptance criteria. That evidence creates a fair basis for comparing reuse, migration and replacement.
For Carolina facilities, the scope should also account for occupied work areas, weather exposure, lightning and surge conditions, local construction coordination, network readiness, service access and the owner’s long-term administration model.
Detailed product and planning guides
Each card below opens a published guide with deeper product-family, design or implementation information.
ZKTeco AtlasCloud and Atlas Embedded Access Control
Open the detailed product, design or implementation guide.
ZKTeco Cielo365, Readers, Biometrics and Entrance Control
Open the detailed product, design or implementation guide.
Capabilities and selection checkpoints
The cards in this section summarize information to evaluate; they are not separate pages. Availability and compatibility can change, so final models and releases must be confirmed against current manufacturer resources.
LONG RANGE READERS
Document who configures, tests, administers and supports this function after the project is accepted.
OUTDOOR FACIAL RECOGNITION
Review compatibility, capacity, infrastructure and lifecycle implications with the complete system design.
Opening compatibility
Connect this capability to a named user workflow and a testable result at the actual facility.
Identity workflow
Review compatibility, capacity, infrastructure and lifecycle implications with the complete system design.
Failure behavior
Confirm which current models, editions, licenses and dependencies support this requirement before procurement.
Integration boundary
Treat this as a design checkpoint; the final selection depends on field conditions and supported releases.
Administration model
Document who configures, tests, administers and supports this function after the project is accepted.
Migration path
Compare retained equipment, migration effort, subscription impact and replacement options for this topic.
Evidence to collect before design
A useful survey and stakeholder review should produce the following project evidence for ZKTECO:
- Door and frame survey, existing lock function, handing, egress behavior and accessibility conditions.
- Credential population, visitor flow, schedules, exception handling and administrator responsibilities.
- Controller, reader, lock, request-to-exit, door-position and power requirements for every opening.
- Fire-alarm, elevator, video, intrusion, directory and identity-system integration boundaries.
- Network segmentation, cloud connectivity, offline behavior, battery runtime and cybersecurity standards.
- Licensing, mobile-credential policy, spare capacity, migration sequence and long-term support ownership.
Architecture and integration review
Opening compatibility
Match the proposed hardware to the actual door, frame, latch, traffic pattern and required free egress.
Identity workflow
Define enrollment, approval, revocation, visitor access and audit responsibilities before configuration.
Failure behavior
Record what must happen during network, cloud, controller, power and fire-alarm events.
Integration boundary
Name the systems exchanging identities, alarms, video, elevator commands or property data.
Administration model
Decide who owns accounts, roles, schedules, reports, backups, updates and after-hours support.
Migration path
Plan retained doors, phased cutover, credential transition and rollback without weakening security.
Compare proposals on the same evidence
Product names and device counts do not make competing proposals equivalent. Ask each bidder to identify assumptions, exclusions, supported versions, owner responsibilities and the proof that will be delivered at acceptance.
| Comparison area | Evidence a complete proposal should provide |
|---|---|
| Fit for the operating need | A written explanation of how ZKTECO supports the required users, events and workflows. |
| Compatibility | A supported-parts, software, license and integration matrix tied to the proposed architecture. |
| Infrastructure | Documented power, network, pathways, environmental and owner-furnished dependencies. |
| Acceptance | Named tests, expected results, exception handling and responsibility for correcting deficiencies. |
| Lifecycle | Current support status, update approach, warranty, subscriptions, spares and replacement planning. |
Deployment and acceptance sequence
- Discovery: agree on users, operating outcomes, retained systems, constraints and acceptance criteria.
- Field validation: verify dimensions, infrastructure, environmental conditions, pathways, power, network and integration points.
- Documented design: name the architecture, supported components, licenses, responsibilities, assumptions and change process.
- Staging and implementation: prepare configuration, backups, labels and test scripts before controlled field deployment.
- Operational acceptance: exercise normal use, exceptions, outages and recovery; then deliver training and system records.
Software, firmware and lifecycle responsibility
Record the installed model, hardware revision, software or firmware release, license or subscription, warranty and administrator ownership at handoff. Those details make later troubleshooting and upgrade planning materially safer.
Downloads, release notes, advisories and manuals should come from the manufacturer’s official portal. 360 Technology Group links to official resources and does not host firmware files locally. Some portals require an authorized customer, dealer or support entitlement.
Before any update, confirm the exact model and region, prerequisites, supported intermediate releases, backup, maintenance window, integration compatibility, rollback limits and post-update test plan. Cloud-managed products may control release timing differently from locally managed systems.
Build a project-specific comparison
Share the facility type, Carolina location, existing platform, approximate device count, operating problem, required integrations and target schedule. 360 Technology Group can use that context to determine whether ZKTECO deserves a detailed site and design review.
Official ZKTeco USA software, firmware and support
Use these manufacturer-owned portals for current downloads, release notes, manuals, advisories and technical resources. 360 Technology Group links to official sources and does not copy or host firmware files.
Update carefully: confirm the exact model, region, hardware revision, installed version, prerequisites, required intermediate releases, support entitlement, integrations, backup, maintenance window, rollback limitations and post-update tests. The wrong package or sequence can interrupt service or prevent a downgrade.
Some portals require a customer, dealer, certified-technician or active-support login. Cloud-managed products may update automatically and may not offer a public firmware file.
